Skip to content

Operating on Provincial Road in Brebach-Fechingen starting from Monday: ZKE

Municipal Waste Disposal Company (ZKE) commences operations on Provincial Street in Brebach-Fechingen, starting June 2.

ZKE Commences Operations Along Provincial Road in Brebach-Fechingen Starting from Monday
ZKE Commences Operations Along Provincial Road in Brebach-Fechingen Starting from Monday

Operating on Provincial Road in Brebach-Fechingen starting from Monday: ZKE

In the picturesque town of Brebach-Fechingen, a short-term emergency measure is set to take place starting on Monday, June 2nd. The municipal central waste disposal company (ZKE) will be carrying out repairs on a combined sewer at house number 59 on Provinzialstraße.

The focus of the operations is on repairing a faulty sewer, a task that is estimated to cost approximately 35,000 euros. This repair, however, is not a permanent solution, as it is designed as a temporary emergency measure. The work is expected to last until Friday, June 13th, but weather conditions may affect the duration of the repair.

To accommodate the construction, Provinzialstraße will be partially closed. Traffic in the construction area will be regulated by a traffic light to ensure smooth flow and safety. Pedestrians can continue to use the sidewalks without any disruption.

Access for emergency and fire vehicles is guaranteed at all times during the construction. Firma Sydow, a reliable company with a proven track record, has been contracted to carry out the emergency repair.

Residents and commuters are advised to plan their routes accordingly, and we appreciate your understanding and cooperation during this necessary repair work. The ZKE will do its best to complete the work as efficiently as possible, ensuring minimal inconvenience to the community.

Stay tuned for updates on this development, and remember, your safety and comfort are our top priority.

Read also:

Latest