Pedestrian and cyclist bridge at Scharnhorststraße extension to be closed from 25th August
The pedestrian and cycle bridge in Extended Scharnhorst Street, directly at the entrance to Osnabrücker Street, will be closed from August 25th to September 5th, 2025. This closure includes a full closure on August 30th, 2025.
The repairs, which are necessary for the concrete slabs on the bridge, are scheduled to be completed by September 5th, 2025. During the closure, entering or exiting Osnabrucker Street will not be possible.
However, pedestrians can use the sidewalk on the opposite side of the street during the closure. Cyclists can detour to the roadway during the closure, but no new information about alternative routes for cyclists during the bridge closure was provided.
The allotment gardens can be reached via the Loitzer Land Street during the bridge closure. A temporary removal of the bollard in the course of the Extended Scharnhorst Street will be necessary for accessing the Loitzer Land Street.
It's important to note that the responsibility for these repairs lies with the local municipal authority or city department in charge of infrastructure and public spaces in that area, typically the city of Osnabrück's building or public works department.
The bridge will be operational again for use by the start of the new school year. No specific information about the reason for the repairs was provided in the text.
For those who may need to detour during the closure, it's recommended to plan alternative routes in advance to ensure a smooth journey. The city of Osnabrück will likely provide more information about this matter in the coming days.
Read also:
- Understanding Hemorrhagic Gastroenteritis: Key Facts
- Trump's Policies: Tariffs, AI, Surveillance, and Possible Martial Law
- Expanded Community Health Involvement by CK Birla Hospitals, Jaipur, Maintained Through Consistent Outreach Programs Across Rajasthan
- Abdominal Fat Accumulation: Causes and Strategies for Reduction