Skip to content

Pipeline construction underway on Edelweißstraße Street

The Online Hub of Landshut, the principal city and regional governorate of Lower Bavaria.

Work underway at pipeline construction site on Edelweißstraße
Work underway at pipeline construction site on Edelweißstraße

Pipeline construction underway on Edelweißstraße Street

Bus users in the area are advised of changes to the route of public utility bus line 3, effective from Monday, September 15, 2025, to Friday, November 28, 2025. The changes are due to ongoing road construction near the bus line.

In the direction of Wolfgangsiedlung, the bus line 3 will travel from Edelweissstraße stop to Tulpenstraße stop via Eichenstraße, Astern Way, and directly to Tulpenstraße stop. During this period, the stops at Edelweissstraße, Eichenstraße, and Weidenweg will not be served. Pedestrians can pass at any time during the construction, but motorists are asked to observe closure and detour signs.

Meanwhile, in the direction of Auloh, the bus line 3 will travel from Tulpenstraße stop via Erlenstraße stop, Enzian Street, Astern Way, Eichen Street, temporary stop Weidenweg, Flur Street, and continue unchanged. The Erlenstraße stop in the direction of Wolfgangsiedlung cannot be served during this period. Instead, a temporary stop has been set up at Weidenweg.

Traffic is being rerouted via Enzian Street, Astern Way, and Eichen Street. The details of the bus line 3's new route in the direction of Wolfgangsiedlung were provided in this article, while the details of the route in the direction of Auloh were not explicitly provided but can be inferred from the given information.

It is important to note that the bus line 3 will run as per a specified route during this period, and passengers are advised to plan their journeys accordingly. The construction work is ongoing, and the road construction near bus line 3 affecting the stops at Edelweißstraße, Eichenstraße, Weidenweg, and Erlenstraße is scheduled during the aforementioned period.

Passengers are encouraged to check the official bus line 3 website or contact customer service for the most up-to-date information on the temporary changes to the bus route and any potential disruptions to services.

Read also:

Latest

New appointment: Dane Hjulmand now leads Bayer Leverkusen football team

Became Coach: Dane Hjulmand at Leverkusen

- Became Coach: Dane Hjulmand at Leverkusen After a brief interim period led by Dutchmen Rogier Meijer and Andries Ulderink, Bayer Leverkusen has announced that Kasper Hjulmand will be taking over as the club's new head coach. The news was first reported by German football magazine "Kicker&